Front Porch Stapleton
April 2016
Denver, Co
  • News
    • Current News
    • Most Views/Comments
      • Most Comments
      • Most Recent Comments
      • Most Views
    • Editors’ Favorites
    • Resource Guides
    • Stapleton Articles
    • PDF Archives
    • Advanced Search
  • Events
    • Upcoming Events
    • Ongoing Events
    • Submit an Event
  • Business Directory
    • Please consider these businesses for your goods and services. They make the paper possible.
  • Display Ads
    • What Front Porch Offers
    • Ad Rates and Sizes
    • Advertising Q&A
    • Sample Ads
    • Distribution Map
    • How Can We Help You?
    • Place An Ad
  • Web Ads
  • Classified Ads
  • More Info
    • Rack Locations
    • Content Submissions
    • About Us
    • Community Resources
  • Home/
  • I-70 Final Decision Expected this Summer

I-70 Final Decision Expected this Summer

March 1, 2016 / John Fernandez / Transportation / No Comments

This cover over a lowered I-70 is intended to reconnect central Denver neighborhoods divided by a noisy viaduct for more than 50 years. Courtesy Colorado Department of Highways.

After 13 years of study, a final decision is expected this summer on how to accommodate huge projected traffic increases on I-70. The preferred alternative proposes removal of the existing viaduct and lowering the highway between Brighton Blvd. and Colorado Blvd. A four-acre cover over the interstate between Clayton and Columbine Streets would relink neighborhoods that have been separated by the elevated viaduct since it was built in 1964.

The remainder of the $1.2 billion phase one project entails full reconstruction of the highway from Colorado Boulevard to Sand Creek (just east of Quebec) and widening of the highway from Sand Creek to Chambers Road. On completion, one “managed” lane (Express Lane) will have been added in each direction. CDOT will construct lighted sidewalks on Quebec under I-70 from ramp to ramp. Construction is slated to begin late 2017.

At its Feb. 18 review, members of the Stapleton Citizens Advisory Board (CAB) expressed concern that a highway widened ultimately to 10 lanes will not allow Stapleton to remain a neighborhood. They urged representatives from the Colorado Department of Transportation (CDOT) to work with the community to widen and fully connect north-south pedestrian and bicycle sidewalks along Quebec and Havana Streets. CAB also suggested a new ped/bike bridge is needed over Sand Creek in the vicinity of the Central Park Station. The public comment period on the Final Environmental Impact Statement (FEIS) ends March 2.

Share this:

  • Click to email this to a friend (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)

Leave a Reply Cancel reply

Advanced Search

303-526-1969
© 2015 Front Porch Stapleton | 303-526-1969 | Denver, CO 80238 | [email protected]
Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.